As entrusted by Zhenhai Refining and Chemical Branch of China Petroleum & Chemical Corporation, the 2.6-million-ton/year refueling unit required a feed pump [2.6 million tons/year of residue hydrotreating unit] for public bidding. This announcement is issued today. Qualified bidders are invited to register. 1. Tender number: WZ20161206-2301-1074-L-B1 2. Project Content: 2.6 million tons/year residual oil hydrogenation device Project Overview: The project has passed the approval and the funds have been implemented. 3. Name and quantity of tender materials: No. Quantity Unit of measure 1 Centrifugal pump BB5-165~215m3/h 2100~2400m Residual oil 175~230°C/0~2MPa/40~50m 3.0 stations 4. Delivery date and place: On December 15, 2017, Zhenhai Refining Designated site or warehouse 5. Bidder's basic qualification requirements: 5.1 Have the right to independently conclude the contract and the ability to perform the contract, obtain a business license in accordance with the law, business license is in its valid period, business license, tax registration certificate, organization code certificate is complete legal person or other organization with complete three certificates. 5.2. For VAT general taxpayers, there were no illegal records in other procurement activities attended in the past three years. 5.3 With the required material supply capacity and quality control measures, no significant quality problems have occurred during the use of the products provided in the past three years. 5.4 has a good business reputation, a sound financial accounting system, financial status and market behavior is good. It is not under the authority of the competent authority to revoke the business license, revoke the qualifications, suspend business for rectification, cancel the qualifications for the bid, and the property is taken over, frozen, or enter bankruptcy procedures. 5.5 There is no state in which Sinopec Corp. has been suspended from trading due to breach of contract or other reasons. 6. Other major qualification requirements: 6.1 The equipment provided by the seller shall meet the requirements of the tender technical documents and related standards and specifications. Any deviation from the applicable standard shall be listed in the supplier's quotation. Otherwise, the seller’s products are all in compliance with the requirements of the tender technical documents and the listed standards. The buyer is not obligated to find any deviation from the deviation list. The non-conformity. 6.2 The seller shall be fully responsible for the entire pump group including auxiliary equipment such as pumps, drives, lubricating oil systems, cooling water systems, meters, and couplings, as well as related equipment and piping systems. It shall be responsible for the assembly of pump units and auxiliary equipment/systems. Design, manufacturing, performance, inspection and testing, quality, delivery, service, etc. are responsible for the integrity and reliability of the entire pump unit and are responsible for a reasonable match between them. 6.3 The seller shall provide a performance statement for the application of similar products. The pump set provided by the seller must be within the scope of the design, manufacturing, and application product that the supplier has completed, and at least two pumps of the same type have a continuous two-year operating experience under similar process operating conditions. At the same time, the seller should be a wholly foreign-owned domestic company or a joint venture. 6.4 The pump is a horizontal double-support double-shell radial split multi-stage structure (API610 BB5 type), in which the inner casing adopts a horizontal split structure. Pump inlets and outlets are vertically upwards, using the centerline support. The design of the pump should be such that the rotor and the inner cylinder can be easily extracted without removing the outlet and inlet lines of the pump. 6.5 The required NPSH for the selected pump type (NPSHr) and the available NPSH in the design data sheet (NPSHa) have a certain amount of margin (NPSHa-NPSHr ≥ 1m) to meet the pump at the minimum continuous steady flow rate to the maximum expected The operating flow protects the pump from damage caused by backflow, separation, and cavitation. When the margin of NPSHa is greater than NPSHr is less than 1m, the pump should be tested for NPSHr, but the margin is not less than 0.6m. Inhalation specific speed reference SHT3139 petrochemical heavy duty centrifugal pump engineering specifications shall not exceed 12780 (r/min, m3/h, m). Note: For the media on the inlet side of the pump in the negative pressure state or operating temperature is higher than 100 °C, the effective NPSH of the pump △ ha should be at least greater than the NPSH △ hr plus 1.3 m water column margin. 6.6 The efficiency of the feed pump (1203-P-8103A/B/C) should meet the standard GB/T 13007-2011. 6.7 The impeller shall be separately tested for static balance with the balance accuracy of G6.3. The integral part of the rotor (including the half coupling at the pump end) shall be tested for low speed dynamic balance. The balance accuracy shall not be lower than G1.0. Balance test should provide test report. 6.8 When the margin of NPSHa is greater than NPSHr is less than 1m, the pump shall be tested for NPSHr. 6.9 According to API-610 standard for the mechanical operation and full performance test of the pump assembly (test performance tolerance implementation of API610 standard), the pump should be full-speed, full-grade, full-flow performance test; and should be carried out for at least 4 hours Mechanical operation test. 7. Comply with other conditions stipulated by laws and regulations. 8. Detailed requirements are detailed in the bidding documents. 9. This tender accepts the application from the manufacturer (manufacturer), does not accept the agent's bid, and does not accept the distributor's bid. 10. The tender does not accept the consortium bid. 11. Evaluation method: Comprehensive evaluation method. 12. The cost of bidding documents: The bidding documents cost 1,000 yuan, which is purchased online and the tender documents are not refundable after sale. 13. Bidding documents Sale time: From 09:00 on December 09, 2016 to 16:00 on December 15, 2016 (Beijing time, the same below).