Pursuant to the "Law of the People's Republic of China on Tendering and Bidding," "The Regulations of the People's Republic of China on Tendering and Bidding Law," and relevant laws and regulations, the principles of openness, fairness, impartiality, and good faith are entrusted by Jiangsu Xutang Power Generation Co., Ltd. 4 No. 5 and No. 5 unit ultra-low-emission reform project added wet-type dust collector and SCR denitrification transformation project for domestic open tender, welcome to meet the qualification requirements of the participating units.
I. Project Description:
Project Name: New Wet Dust Collector and SCR Denitrification Improvement Project for Ultra Low Emission Project of Units 4 and 5 of Jiangsu Xutang Power Generation Co., Ltd.
Project Location: No. 1, Guangming Road, Shuozhou City, Jiangsu Province.
Second, the scope of the tender:
The current renovation project is a wet-type electrostatic precipitator facility for supporting the construction of Unit #6, achieving ultra-low emissions of flue gas pollutants, and meeting the emission limits set in the “Fuel Emission Standards for Thermal Power Plants†(GB13223-2011). In the above, the emission standards for natural gas-fired gas turbine units are met, that is, the dust emission concentration is not more than 5mg/Nm3.
All safety measures, machinery, use of tools, labor protection products, and personnel insurance required for construction are included in the contract cost. The specific content of the tender documents shall prevail.
The detailed work content and technical requirements shall be based on the final record of the bidding documents.
Third, the bidder's qualification requirements:
The bidder shall have the ability to perform the contract satisfactorily and shall meet the following conditions:3.1 The total contracted performance of wet scrubbers with a coal-fired thermal power unit of 300 MW or more units with a capacity of 2 sets or more in the past five years; 300 MW rated turbines with more than 2 sets (inclusive) or more in the past five years Denitrification Total Contracting Performance of Coal-fired Thermal Power Units
3.2 With Class A and above qualifications for environmental engineering (air pollution prevention and control projects), the corresponding construction engineering general contracting business and project management and related technical and management services within the scope of qualification certificate can be engaged.
3.3 The bidder intends to send the project manager must have the performance of undertaking the same type of project, the project manager must have a secondary constructor and above qualification certificate.
3.4 has a complete equipment performance and quality assurance system. If it is a Sino-foreign joint venture (cooperation) enterprise and the technical support is provided by a foreign party, it shall issue a written document (copy) of the equipment performance and/or quality assurance of the foreign joint venture (cooperation) party.
3.5 The bidder’s registered capital is not less than 10 million yuan.
Fourth, the tender documents obtained:
4.1 Ways to Obtain Bidding Documents: Log in, apply for the bidding document with the company's CA certificate electronic key and follow-up bids.
4.2 Bidding Documents Available: November 15 to November 25, 2016.
2) The result of the purchase is subject to the platform.
4.3 After the tender has adopted the post-qualification method, the bid evaluation committee will review the qualifications of the bidders after the bid opening. The bidders' bids that do not meet the requirements of the tender notice will be treated as rejected bids.
V. Submission of tender documents:
5.1 Deadline for Submitting Bidding Documents (Bid Deadline, the same below): December 10, 2016, 10:00 am.
5.2 Delivery Location: Beijing.
5.3 Ways of submission: Prior to the deadline for submitting tender documents, potential bidders submitted paper tender documents and their electronic versions according to the requirements of the tender documents, and completed the electronic uploading and uploading of electronic tender documents on e-commerce platforms. Written documents submitted late or not delivered to designated locations or not sealed as required will not be accepted by the tenderee.
5.4 Other submission methods and issues requiring attention: The electronic version of the bidding documents needs to be submitted on the platform, and the electronic opening and evaluation of bids shall be implemented. Do not open the bidder's written bid documents, sing the target, only for archiving use.
The opening of the bid is subject to the electronic bid opening method. For bidders who are not familiar with the online bidding operation, we will hold a training conference.
Contact: Qian Yong
Mobile:
phone
fax
E-mail:
In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.
Usb Megaphone,Megaphone With Usb,Megaphone With Bluetooth,Megaphone With Usb Port
Shangqiu Huayitong electronic technology co., Ltd. , https://www.huayitongmegaphones.com