In order to ensure the effective connection between the project approval system and the approval system, and ensure that the power grid project is approved by the state investment department in a timely manner, the State Grid Corporation Development Planning Department issued a notice on June 2 to approve the application for the construction of the 330 kV and above power grid projects. The contents of the report make the following requirements:
??
The power grid project approval application report includes two parts: the text and the annex:
??
First, the body part
??
(1) Necessity of project construction and construction timing?
Explain the economic status and development planning of the relevant areas of the project, the current status and development planning of the power system, the analysis of the power market, the social and economic benefits of the project, the role in the power grid, and the arrangement of the project in the power grid planning, etc., highlighting the necessity of project construction. And the rationality of the construction timing. ??
(II) Project construction scale and construction conditions?
Explain the nature and scale of the project construction (including primary and secondary equipment and compensation devices) and project schedule. Briefly describe the natural conditions of the project site, the geographical location of the corridor, geology, etc., and explain the amount of land used for the project, the nature of the land used, the mineral resources and cultural relics, and the relationship with the local urban development plan. ??
(3) Analysis of ecological environment impact?
Explain the environmental protection standards implemented by the project, the environmental protection, pollution prevention and soil and water conservation measures adopted by the project. Comprehensively analyze the impact of the project on the ecological environment according to the environmental assessment program. ??
(4) Compensation for land acquisition and demolition of the project?
Explain the scope of land acquisition and the main physical indicators for land acquisition. Briefly describe the socio-economic situation and its impact of the areas involved in land acquisition for project construction. Explain the construction compensation plan for land acquisition and demolition. Estimate the construction land acquisition and compensation investment according to the standards determined by the government. ??
(5) Investment budget and economic analysis?
Briefly describe the total investment of the project, explain the principles, basis and price level of the investment budget calculation, and analyze the main factors affecting the project cost. Propose a financing plan including the construction of funding sources and investment composition. Comprehensive evaluation of the economics of the project.
??
Second, the annex part??
(1) When reporting the project application report, the following relevant supporting documents must be attached: ??
1. Wiring diagram of the grid in the region where the project is put into production (electronic version)??
2. The consulting organization's comments on the project??
3. Pre-examination documents for land use issued by the Ministry of Land and Resources?
4. Environmental Impact Assessment Document issued by the State Environmental Protection Administration?
5. The preliminary opinion documents of the municipal, county-level and above planning authorities on the project?
6. Financial institutions issue a commitment document to approve the loan??
(2) For the following supporting documents, depending on the specific conditions of the project, determine whether to provide:
1. The opinion of the competent water conservancy department on the soil and water conservation of the project?
2. Opinions of geology authorities at the local (city) level on the evaluation of geological disasters?
3. Opinions of the local (city)-level earthquake authorities on seismic safety evaluation?
4. The non-pressure mineral certification document issued by the local (city) level mining authority?
5. Unprotected cultural relic documents issued by the competent authorities of prefecture (city) level cultural relics??
In view of the unique characteristics of the power grid construction project, the specific problems existing in the specific project should be analyzed in detail, and the particularity should be clarified in detail.
The authenticity of this information has not been confirmed by the international electrical network, for your reference only.
Noise cancelling headphones ensure you enjoy Hands-free conversations and super clear sound with these in 3.5mm ear stereo headset with On-off switch,which includes integrated earpieces and microphone.Noise reduction headphones produce a crisp powerful acoustic sound with strong deep bass. Studio-tuned audio with crystal clarity guaranteed and are very convenient for travel, excellent for noisy listening environments and can sound as good as the very best over ear or the beset on ear headphones. these noise isolating headphones reduce ambient noise for an exceptional audio experience.All of our earbuds come with an array of different sizes/types of eartips. Hybrid Headphones with Dual sound unit, Composite metal diaphragm with the sandwich design which balance the middle - low frequency fidelity.In-line three-button remote control and one button for Microphone. Dynamic earphones &Balance Armature Hybrid Sport Earphone with Microphone/Play/Pause features.Compatible with MP3/MP4/Smart phones/Computer/ipads.
whether is vocal,IF,bass,or high pitch, these headphones can be easily handled,the advantages of the dynamic&balance armature,it can be wide depth to analysis the sound field.also Support MMCX Bluetooth Cable.
Impedance: 12+/-15Ohm
Sensitivity: 103dB+/-3dB
Rated Power: 3mW
Frequency Range : 20-22,000Hz.
Distortion : <5%.(1KHZ,105db SPL)
Drivers:dymamic+BA,closed
Damping:25db raech to 25db
In-Ear Earphones
In-Ear Earphones,Stereo Earphones,3.5Mm Headphone,Noise Isolating Headset
Hele Enterprise Co., Limited , http://www.heleqcy.com